
2004_02_20 003 Main Roof Going On.jpg

2004_02_20 005 Roof Complete on the Back of the House.jpg

2004_02_20 007 Roof Except for the Master Bedroom.jpg

2004_02_20 013 Corte Throwing a Snowball off the Back Porch.jpg

2004_02_20 014 Roof Started over the Master Bedroom.jpg

2004_02_20 016 Last Section of Roof.jpg

2004_02_20 064 HVAC Work begins Upstairs.jpg

2004_02_20 065 Wendi in the Fireplace.jpg

2004_02_20 067 Skylights for the Master Bath and Closet.jpg

2004_02_20 068 Trayed Ceiling in the Master Bedroom.jpg

2004_02_20 071 Kid's Playing in the Melting Snow Pond.jpg

2004_02_20 086 Neat Trayed Ceiling Stud Work.jpg

2004_02_20 091 Plywood Roof almost Complete.jpg

2004_02_20 114 Shingles Have Arrived.jpg

2004_02_20 116 Corte by one of the Shingles Pallets.jpg

2004_02_20 122 Back Porch with Most of the Snow Melted.jpg
|