2003_12_22 030 Concrete under the Garage Poured

2003_12_22 030 Concrete under the Garage Poured.jpg

2003_12_22 032 Basement Walls Framed

2003_12_22 032 Basement Walls Framed.jpg

2003_12_22 033 One Window East side

2003_12_22 033 One Window East side.jpg

2003_12_22 035 Pile of Engineered I Beams and Plywood

2003_12_22 035 Pile of Engineered I Beams and Plywood.jpg

2003_12_22 060 Carpenters, Electricians, and Plumbers on Christmas Eve

2003_12_22 060 Carpenters, Electricians, and Plumbers on Christmas Eve.jpg

2003_12_22 066 Floor Joists Started

2003_12_22 066 Floor Joists Started.jpg

2003_12_22 072 Electrical Service Installed

2003_12_22 072 Electrical Service Installed.jpg

2003_12_22 073 David through the Basement Window next to the Entrance Panels

2003_12_22 073 David through the Basement Window next to the Entrance Panels.jpg

2003_12_22 074 Basement Windows

2003_12_22 074 Basement Windows.jpg

2003_12_22 078 Plumbing Sump

2003_12_22 078 Plumbing Sump.jpg

2003_12_22 081 Uncle Dave in the Media Room

2003_12_22 081 Uncle Dave in the Media Room.jpg