
2004_04_03 012 Bricks for the Fireplace.jpg

2004_04_03 014 Stairs up to the Garage Poured.jpg

2004_04_03 017 Siding on the Master Bedroom Wall.jpg

2004_04_03 020 Fireplace on the First Floor.jpg

2004_04_03 022 Fireplace in the Basement.jpg

2004_04_03 025 Inside of the Upstairs Fireplace.jpg

2004_04_03 026 Deck and Fireplace Partially Finsihed.jpg

2004_04_03 030 Chimney and Deck Complete.jpg

2004_04_03 034 Siding on the Side of the House Finished.jpg

2004_04_03 049 HVAC Run in the Media Room.jpg

2004_04_03 050 Lots of Conduit in the Basement.jpg

2004_04_03 053 Tub and Shower in the Master Bath.jpg

2004_04_03 069 Water Supply Lines and Electrical.jpg

2004_04_03 074 Dog Shower in the Garage.jpg

2004_04_03 077 Garage Floor has been Grouted.jpg

2004_04_03 079 19 Lighting Cans in the Kitchen.jpg

2004_04_03 081 Siding Complete on the West Side of the House.jpg

2004_04_03 082 George Hiller Sign makes it onto the Property.jpg
|